1.1 |
Date updated: |
Nov 08, 2024 |
1.2 |
Vessel's name (IMO number): |
Green Sky (9676515) |
1.2b |
Is the vessel owner/manager a member of INTERTANKO? If yes, please provide IMO number of the Member organization |
No, |
1.3 |
Vessel's previous name(s) and date(s) of change: |
Not Applicable |
1.4 |
Date delivered / Builder (where built): |
Jun 27, 2014 / DAESUN SHIPBUILDING AND ENGINEERING CO LTD , BUSAN KOREA |
1.5 |
Flag / Port of Registry: |
Liberia / Monrovia |
1.6 |
Call sign / MMSI: |
D5FK4 / 636016292 |
1.7 |
Vessel's contact details (satcom/fax/email etc.): |
Tel: 870 773151506 |
Fax: 00870783207573 |
Email: greensky@aegean-shipping.com |
1.8 |
Type of vessel (as described in Form A or Form B Q1.11 of the IOPPC): |
Oil Tanker |
1.8a |
If other type of vessel, please specify: |
Crude Oil / Product Carrier |
1.9 |
Type of hull: |
Double Hull |
1.10 |
Registered owner - Full style: IMO Number |
OCEAN YANGTZE NINE LIMITED (Foreign Maritime Entity), HONG KONG 31F, China Merchant Tower, No. 1166 Wanghai Road, Shekou, Shenzhen Hong Kong IMO: 6237529 |
1.11 |
Technical operator - Full style: |
AEGEAN SHIPPING MANAGEMENT SA AKTI KONDILI 10 , PIRAEUS , 18545 Greece Tel: 00 302104586000 Fax: 00 30210 4586242 Email: operations@aegean-shipping.com Web: www.aegean-shipping.com Company IMO#: 1649150 |
1.12 |
Commercial operator - Full style: |
Mercuria Shipping SARL Rue Du Rhone 50, Geneva, 1204, Switzerland Email: WetTC.ops@mercuria.com |
1.13 |
Disponent owner - Full style: |
Mercuria Shipping SARL Rue Du Rhone 50, Geneva, 1204, Switzerland Email: WetTC.ops@mercuria.com |
1.14 |
P & I Club - Full Style: |
Assuranceforeningen Skuld Assuranceforeningen Skuld (Gjensidig), P.O. Box, 1376 Vika, N-0114 Oslo, Norway, and
Skuld Mutual Protection and Indemnity Association (Bermuda) Ltd. Tel: +4795292200 |
1.15 |
P & I Club pollution liability coverage / expiration date: |
1,000,000,000 US$ |
Feb 20, 2025 |
1.16 |
Hull & Machinery insured by - Full Style: (Specify broker or leading underwriter) |
Allianz (Leading Underwriter) |
1.17 |
Hull & Machinery insured value / expiration date: |
31,000,000.00 US$ |
Apr 03, 2025 |
1.18 |
Classification society: |
Lloyds Register |
1.18a |
Is Classification Society an IACS member? |
Yes |
1.19 |
Class notation: |
+100A1,Double Hull Oil & Chemical Tanker , Ship Type 2 and Ship Type 3 , CSR , ESP , *IWS , LI , SPM4 , +LMC , IGS , UMS , BWTS* , ShipRight (BWMP(S,T), E , SCM , VECS , SERS, IHM-EU+) |
1.20 |
Does the vessel have any open conditions of Class?? If yes List all open conditions: |
No
|
1.20a |
Does the vessel have any Memoranda of Class? If yes, list details: |
No
|
1.21 |
If classification society changed, name of previous and date of change: |
Germanischer Lloyd, Jun 25, 2019 |
1.22 |
Does the vessel have ice class? If yes, state what level: |
N/A, |
1.23 |
Date / place of last dry-dock: |
Jul 19, 2024 / Setubal (Lisnave Shipyard) |
1.24 |
Date next dry dock due / next annual survey due: |
Jun 26, 2029 |
|
1.25 |
Date of last special survey / next special survey due: |
Jul 17, 2024 |
Jun 26, 2029 |
1.26 |
If ship has Condition Assessment Program (CAP), what is the latest overall rating: |
No, |
1.27 |
Length overall (LOA): |
183.10 m |
1.28 |
Length between perpendiculars (LBP): |
174 m |
1.29 |
Extreme breadth (Beam): |
32.20 m |
1.30 |
Moulded depth: |
19.10 m |
1.31 |
Keel to masthead (KTM) / Keel to masthead (KTM) in collapsed condition, if applicable: |
47.91 m |
m |
1.32 |
Distance bridge front to center of manifold: |
55.10 m |
1.33 |
Bow to center manifold (BCM) / Stern to center manifold (SCM): |
92.40 m |
90.60 m |
1.34 |
Parallel body distances: |
Lightship |
Normal Ballast |
Summer Dwt |
Forward to mid-point manifold: |
32.24 m |
35.20 m |
34.80 m |
Aft to mid-point manifold: |
30.76 m |
34.93 m |
51.77 m |
Parallel body length: |
63 m |
70.13 m |
86.57 m |
1.35 |
Net Tonnage: |
13,887 |
1.36 |
Gross Tonnage / Reduced Gross Tonnage (if applicable): |
30,263 |
23,734 |
1.37 |
Suez Canal Tonnage - Gross (SCGT) / Net (SCNT): |
30,591.48 |
25,964 |
1.38 |
Is vessel fitted for transit of Panama Canal? Panama Canal Net Tonnage (PCNT): |
Yes, 25,142 |
1.39 |
Loadline |
Freeboard |
Draft |
Deadweight |
Displacement |
Summer: |
5.813 m |
13.31 m |
50,879.50 MT |
61,929.30 MT |
Winter: |
6.09 m |
13.04 m |
49,426 MT |
60,475.80 MT |
Tropical: |
5.54 m |
13.59 m |
52,336.90 MT |
63,386.70 MT |
Normal loaded condition: |
5.79 m |
13.31 m |
50,879.50 MT |
61,929.30 MT |
Lightship: |
16.30 m |
2.80 m |
Not Applicable |
11,049.80 MT |
Normal Ballast Condition: |
11.90 m |
7.39 m |
20,000 MT |
31,049 MT |
Segregated Ballast Condition: |
11.90 m |
7.39 m |
20,000 MT |
31,049 MT |
1.40 |
FWA/TPC at summer draft: |
295 mm |
52.50 MT |
1.41 |
Have multiple deadweights been assigned? If yes, list all assigned deadweights: |
Yes Assigned DWT 1: 50,879.50 Assigned DWT 2: 44,999 Assigned DWT 3: 34,999 Assigned DWT 4: Assigned DWT 5: |
1.42 |
Constant (excluding fresh water): |
100.00 MT |
1.43 |
What is the company guidelines for Under Keel Clearance (UKC) for this vessel? |
At Sea
During Ocean Passages: All vessels shall allow for UKC of at least 20% of vessel's draft irrespective of vessel's speed. (Example: ship with draft of 11.00 m should not enter waters with depths of less than 13.20 m.)
Ship To Ship Operations: All vessels shall allow for UKC of at least 20% of vessel's draft.
Fairways: All vessels shall allow for UKC of at least 15% of deepest draft.
In Confined Waters: All vessels shall allow for UKC of at least 10% of vessel's draft.
Canal Passage: As per local navigation rules.
SBM, CBM and Sea Island Terminals
Berths in open locations such as SBM's, Sea Island Terminals and CBM may suffer from the pronounced effects of waves. Consequently weather and sea conditions may require that consideration is given to increasing the UKC allowance to at least 15% of vessel's draft.
Deep drafted vessels in passages straits and channels governed by local regulations (such as VLCC Passage in Malacca and Singapore Straits).
UNDER KEEL CLEARANCE ALONGSIDE BERTH
During the planning stage of a voyage the Master should assess the minimum UKC he is likely to encounter while vessel alongside berth taking all variables into account (tides, loading/discharging plan stages, air-draft restrictions, terminal/port requirements, etc.). The Master should then ensure that the UKC is MINIMUM 40 (Forty) centimeters while vessel is secured alongside berth or engaged in mooring or unmooring operation. In any case that the Minimum UKC could not be maintained, Master shall consult immediately the Operations Manager for further instructions. |
1.44 |
What is the max height of mast above waterline (air draft) |
Full Mast |
Collapsed Mast |
Summer deadweight: |
34.61 m |
0 m |
Normal ballast: |
40.55 m |
0 m |
Lightship: |
45.11 m |
0 m |
|
2.1 |
Safety Equipment Certificate (SEC): |
Jul 19, 2024 |
|
|
Jun 26, 2029 |
2.2 |
Safety Radio Certificate (SRC): |
Jul 19, 2024 |
|
|
Jun 26, 2029 |
2.3 |
Safety Construction Certificate (SCC): |
Jul 19, 2024 |
|
|
Jun 26, 2029 |
2.4 |
International Loadline Certificate (ILC): |
Jul 19, 2024 |
|
|
Jun 26, 2029 |
2.5 |
International Oil Pollution Prevention Certificate (IOPPC): |
Jul 19, 2024 |
|
|
Jun 26, 2029 |
2.6 |
International Ship Security Certificate (ISSC): |
Nov 20, 2019 |
Jun 26, 2020 |
Aug 08, 2022 |
Dec 19, 2029 |
2.7 |
Maritime Labour Certificate (MLC): |
Dec 19, 2019 |
Not Applicable |
Aug 07, 2022 |
Dec 19, 2029 |
2.8 |
Minimum Safe Manning Certificate (MSM): |
Jan 25, 2023 |
Not Applicable |
Not Applicable |
Permanent |
2.9 |
ISM Safety Management Certificate (SMC): |
Nov 20, 2019 |
Not Applicable |
Aug 08, 2022 |
Dec 19, 2029 |
2.10 |
Document of Compliance (DOC): |
Feb 13, 2023 |
|
|
Apr 21, 2028 |
2.11 |
USCG Certificate of Compliance (USCGCOC): |
Aug 28, 2023 |
Oct 12, 2024 |
Not Applicable |
Aug 28, 2025 |
2.12 |
Civil Liability Convention (CLC) 1992 Certificate: |
Feb 20, 2024 |
Not Applicable |
Not Applicable |
Feb 20, 2025 |
2.13 |
Civil Liability for Bunker Oil Pollution Damage Convention (CLBC) Certificate: |
Feb 20, 2024 |
Not Applicable |
Not Applicable |
Feb 20, 2025 |
2.14 |
Liability for the Removal of Wrecks Certificate (WRC): |
Feb 20, 2024 |
Not Applicable |
Not Applicable |
Feb 20, 2025 |
2.15 |
U.S. Certificate of Financial Responsibility (COFR): |
Aug 07, 2023 |
Not Applicable |
Not Applicable |
Aug 07, 2026 |
2.16 |
Certificate of Class (COC): |
Jul 19, 2024 |
|
|
Jun 26, 2029 |
2.17 |
Certificate of Registry (COR): |
Nov 12, 2021 |
Not Applicable |
Not Applicable |
|
2.18 |
International Sewage Pollution Prevention Certificate (ISPPC) |
Jul 19, 2024 |
Not Applicable |
Not Applicable |
Jun 26, 2029 |
2.19 |
Certificate of Fitness (COF): |
Jul 19, 2024 |
|
|
Jun 26, 2029 |
2.20 |
International Energy Efficiency Certificate (IEEC): |
Jul 19, 2024 |
Not Applicable |
Not Applicable |
Not Applicable |
2.21 |
International Air Pollution Prevention Certificate (IAPPC): |
Jul 19, 2024 |
|
|
Jun 26, 2029 |
2.22 |
Ship Sanitation Control (SSCC)/Ship Sanitation Control Exemption (SSCE): |
Sep 19, 2024 |
Not Applicable |
Not Applicable |
Mar 19, 2025 |
2.23 |
Does the vessel have an International Ballast Water Management Certificate? If no, then describe how ship complies with the "International Convention for the Control and Management of Ships' Ballast Water and Sediments"?: |
Yes, |
2.24 |
Owner warrant that vessel is member of ITOPF and will remain so for the entire duration of this voyage/contract: |
Yes |
2.25 |
Does vessel have in place a Drug and Alcohol Policy complying with OCIMF guidelines for Control of Drugs and Alcohol Onboard Ship? |
Yes |
2.26 |
Is the ITF Special Agreement on board (if applicable)? |
Yes |
2.27 |
ITF Blue Card expiry date (if applicable): |
Aug 18, 2025 |
|
3.1 |
Nationality of Master: |
Filipino |
3.2 |
Number and nationality of Officers: |
9 |
Filipino |
3.3 |
Number and nationality of Crew: |
Nationality | Count |
---|
PHILIPPINES | 12 |
|
3.4 |
What is the common working language onboard: |
English |
3.5 |
Do officers speak and understand English? |
Yes |
3.6 |
If Officers/ratings employed by a Manning Agency - Full style: |
Officers:
Company Name | Address | Phone | Fax | Email |
---|
Ratings:
Company Name | Address | Phone | Fax | Email |
---|
|
|
4.1 |
Has the vessel Operator submitted a Vessel Spill Response Plan to the US Coast Guard which has been approved by official USCG letter? |
Yes |
4.2 |
Qualified individual (QI) - Full style: |
Hudson Marine Management Service 4350 HADDONFIELD ROAD, FAIRWAY CORPORATE CENTER II, SUITE #302 , PENNSAUKEN , NEW JERSEY 08109 , USA Tel: 001 8564860800 Fax: 001 8564860081 Email: REPORTING@HUDSONMARINE.COM Web: WWW.HUDSONMARINE.COM |
4.3 |
Oil Spill Response Organization (OSRO) - Full style: |
Marine Spill Response Corporation 220 Spring Street Suite 500
Herndon, Virginia 20170 , USA Tel: 0018002596772 / 0017324170175 |
4.4 |
Salvage and Marine Firefighting Services (SMFF) - Full Style: |
T&T SALVAGE, LLC 8717 Humble Westfield Road
Humble, TX 77338 , USA Tel: 001713 534 0700 / 0012814464010 Email: info@ttsalvage.com /vesselresponse@ttsalvage.com |
|
5.1 |
Is the vessel operated under a Quality Management System? If Yes, what type of system? (ISO9001 or IMO Resolution A.741(18) as amended): |
Yes IMO Resolution A.741(18)) |
5.2 |
Can the ship comply with the ICS Helicopter Guidelines? |
Yes |
5.2.1 |
If Yes, state whether winching or landing area provided: |
Winching |
5.2.2 |
If Yes, what is the diameter of the circle provided: |
4.80 m |
|
6.1 |
Cargo tanks:
Tank ID | Tank PSC | Tank Type | Constr | Coated Y/N | Coating Type | Extent | Condition | Date | Insp date | Insp Freq |
---|
123456 | P | NA | Mild Steel | Yes | Epoxy | Full Tank | Good | Feb 20, 2014 | Jul 16, 2024 | Annual | 123456 | S | NA | Mild Steel | Yes | Epoxy | Full Tank | Good | Feb 20, 2014 | Jul 16, 2024 | Annual | 7 | P | Slop | Mild Steel | Yes | Epoxy | Full Tank | Good | Feb 20, 2014 | Jul 16, 2024 | Annual | 7 | S | Slop | Mild Steel | Yes | Epoxy | Full Tank | Good | Feb 20, 2015 | Jul 16, 2024 | Annual | 8 | C | Residual | Mild Steel | Yes | Epoxy | Full Tank | Good | Feb 20, 2014 | Jul 16, 2024 | Annual |
Anodes Fitted: No |
Ballast tanks:
ID | Coated? | Type | Extent | Condition | Coating date | Insp date | Insp freq |
---|
FPT | Yes | Epoxy | Full Tank | Good | Feb 01, 2014 | Jun 20, 2024 | Biannual | 1234567 P/S | Yes | Epoxy | Full Tank | Good | Feb 01, 2014 | Jun 20, 2024 | Biannual | APT | Yes | Epoxy | Full Tank | Good | Feb 01, 2014 | Jun 20, 2024 | Biannual |
Anodes Fitted: Yes |
|
7.1 |
Ballast Handling Data
Number | Type | Prime mover type | Capacity (m3/hr) | Head (bar) |
---|
2 | Submerged Centrifugal | Hydraulic motor driven | 750 | 35 |
|
7.2 |
Does the vessel comply with D1 or D2 performance standards? |
D2 |
7.3 |
Does the vessel have a Ballast Water Treatment System (BWTS) fitted? |
Yes |
7.4 |
What type of BWTS fitted? If other system fitted, please advise: |
UV Light, |
7.5 |
Name of manufacturer of BWTS: |
Alfa Laval , Pure Ballast 3.1 EX UV REACTOR |
7.6 |
Does the BWTS have IMO type approval? |
Yes |
7.7 |
Is the BWTS of a USCG approved type? |
Yes |
|
8.1 |
Is vessel fitted with centerline bulkhead in all cargo tanks? If Yes, solid or perforated: |
Yes, Solid |
8.2 |
Cargo Tank Capacities at 98% Full - Centre:
Total Centre: m3
Cargo Tank Capacities at 98% Full - Wing:
Tank Number | Capacity (m3) | P/S |
---|
No 1 COT | 3244.99 | Port | No 1 COT | 3244.68 | Stbd | No 2 COT | 4502.67 | Port | No 2 COT | 4487.23 | Stbd | No 3 COT | 4607.96 | Port | No 3 COT | 4591.44 | Stbd | No 4 COT | 4606.37 | Port | No 4 COT | 4593.7 | Stbd | No 5 COT | 4611.9 | Port | No 5 COT | 4596.1 | Stbd | No 6 COT | 4459.89 | Port | No 6 COT | 4446.49 | Stbd |
Total Wing: 51,993.42 m3
Deck Tank Capacities at 98% Full:
Total Deck: m3
|
8.2.1 |
Capacity (98%) of each natural segregation with double valve (specify tanks): |
Seg#1: 6493.1 m3 (No 1 P/S) Seg#2: 8989.99 m3 (No 2 P/S) Seg#3: 9206.96 m3 (No 3 P/S) Seg#4: 9201.78 m3 (No 4 P/S) Seg#5: 9208.51 m3 (No 5 P/S) Seg#6: 8910.58 m3 (No 6 P/S) Seg#7: 1176.64 m3 (Slops W) |
8.2.2 |
IMO class (Oil/Chemical Ship Type 1, 2 or 3): |
IMO 2 (IMO 2 & IMO 3) |
8.3 |
Slop tank capacities (98%):
Tank Number | Capacity (m3) | P/S |
---|
Slop | 526.05 | Port | Slop | 652.59 | Stbd |
Total: 1,178.64 m3
|
8.3.1 |
Specify segregations which slops tanks belong to and their capacity with double valve: |
individual tanks |
8.3.2 |
Residual/Retention oil tank(s) capacity (98%), if applicable: |
143.86 m3 |
8.3.3 |
What is total SBT capacity and percentage of SDWT vessel can maintain? |
N/A |
N/A |
8.3.4 |
Does vessel meet the requirements of MARPOL Annex I Reg 18.2: |
N/A |
8.4 |
How many grades/products can vessel load/discharge with double valve segregation: |
6 |
8.4.1 |
State type of cargo containment (integral, independent, gravity or pressure tanks): |
|
8.5 |
Are there any cargo tank filling restrictions? If yes, specify number of slack tanks, max s.g., ullage restrictions etc.: |
No N/A |
8.6 |
Max loading rate for homogenous cargo |
With VECS |
Without VECS |
Loaded per manifold connection: |
1,500 m3/hr |
1,500 m3/hr (Provided that cargo is loaded, concurrently, at more than one tank.) |
Loaded simultaneously through all manifolds: |
4,380 m3/hr |
4,380 m3/hr |
8.7 |
Is ship fitted with a Cargo Control Room (CCR)? |
Yes |
8.8 |
Can tank innage / ullage be read from the CCR? |
Yes |
8.9 |
Is gauging system certified and calibrated? If no, specify which ones are not calibrated: |
Yes, |
|
What type of gauging system as per IBC 13.1 is fitted (Open/Restricted/Closed): |
|
|
What type of fixed closed tank gauging system is fitted: |
N/A |
|
Is a tank overflow control system fitted? If yes, then state if system includes automatic closing of valves? |
No, No |
|
Are high level alarms fitted to the cargo tanks? If Yes, indicate whether to all tanks or partial: |
Yes, Yes |
8.9.1 |
Can cargo be transferred under closed loading conditions in accordance with ISGOTT 11.1.6.6? |
N/A |
8.9.2 |
Are cargo tanks fitted with multipoint gauging? If yes, specify type and locations: |
Yes, |
8.10 |
Number of portable gauging units (example- MMC) on board: |
3 |
8.11 |
Is a Vapour Emission Control System (VECS) fitted? |
Yes |
|
If fitted, is vapour line return manifold in compliance with OCIMF Guidelines? |
Yes |
|
If fitted, how many vapor return segregations can the vessel maintain simultaneously? |
3 |
|
Does the ship possess Vapour Emission Control (VEC) Certification? If yes, state the issuing authority |
Yes, By LR (ex GL) and USCG |
8.12 |
Number/size of VECS manifolds (per side): |
2 |
300 mm |
8.13 |
Number / size / type of VECS reducers: |
1 x 300mm / 300mm (12 /12")
1 x 400mm / 300 mm (16/12") |
8.14 |
State what type of venting system is fitted: |
Individual PV Valves on each Cargo tank , Two Mast Risers |
8.15 |
Total number/size of cargo manifold connections on each side:
No.: 6
Size:
Manifold | PCS | Size | Unit | Pressure Rating | Unit PR | Standard |
---|
1 | P | 300 | mm | 14 | Bar | ANSI | 1 | S | 300 | mm | 14 | Bar | ANSI | 2 | P | 300 | mm | 14 | Bar | ANSI | 2 | S | 300 | mm | 14 | Bar | ANSI | 3 | P | 300 | mm | 14 | Bar | ANSI | 3 | S | 300 | mm | 14 | Bar | ANSI | 4 | P | 300 | mm | 14 | Bar | ANSI | 4 | S | 300 | mm | 14 | Bar | ANSI | 5 | P | 300 | mm | 14 | Bar | ANSI | 5 | S | 300 | mm | 14 | Bar | ANSI | 6 | P | 300 | mm | 14 | Bar | ANSI | 6 | S | 300 | mm | 14 | Bar | ANSI |
|
8.15.1 |
Is the vessel fitted with a fixed common line? |
Yes |
|
What is the number of common cargo connections per side? |
6 |
|
What is the size of common cargo connections? |
300 mm |
8.16 |
What type of valves are fitted at manifold: |
Butterfly, |
8.17 |
What is the material/rating of the manifold: |
SS / ANSI B16.5 |
8.17.1 |
Does vessel comply with the latest edition of the OCIMF 'Recommendations for Oil Tanker Manifolds and Associated Equipment'? |
Yes |
8.18 |
Distance between cargo manifold centers: |
2,000 mm |
8.19 |
Distance ships rail to manifold: |
4,430 mm |
8.20 |
Distance manifold to ships side: |
4,600 mm |
8.21 |
Top of rail to center of manifold: |
700 mm |
8.22 |
Distance main deck to center of manifold: |
2,100 mm |
8.23 |
Spill tank grating to center of manifold: |
900 mm |
8.24 |
Manifold height above the waterline in normal ballast / at SDWT condition: |
13.82 m |
7.90 m |
8.25 |
Number / size / type of reducers: |
12 x 300/400mm (12/16") 2 x 200/400mm (8/16") 6 x 300/300mm (12/12") 6 x 300/250mm (12/10") 6 x 300/200mm (12/8") ANSI |
8.26 |
Is vessel fitted with a stern manifold? If yes, state size: |
No, mm |
8.27 |
Provide details of Heating Coils/Heat Exchangers |
Tank ID | P/C/S/ Decktank/ Other | Heat exchanger | Internal/External | External ducts | Heating coils | Heating coil sets | Height of the heating coils above tank bottom (mm) | total heating surface (m2) | Ratio of the heating surface | Welded or coupled | Material |
---|
1 | P | No | Internal | No | Yes | 4 | 150 | 60.59 | 0.01 | Welded | SS | 1 | S | No | Internal | No | Yes | 4 | 150 | 60.59 | 0.01 | Welded | SS | 2 | P | No | Internal | No | Yes | 4 | 150 | 73.65 | 0.01 | Welded | SS | 2 | S | No | Internal | No | Yes | 4 | 150 | 73.65 | 0.01 | Welded | SS | 3 | P | No | Internal | No | Yes | 4 | 150 | 73.82 | 0.01 | Welded | SS | 3 | S | No | Internal | No | Yes | 4 | 150 | 73.82 | 0.01 | Welded | SS | 4 | P | No | Internal | No | Yes | 4 | 150 | 73.82 | 0.01 | Welded | SS | 4 | S | No | Internal | No | Yes | 4 | 150 | 73.82 | 0.01 | Welded | SS | 5 | P | No | Internal | No | Yes | 4 | 150 | 73.82 | 0.01 | Welded | SS | 5 | S | No | Internal | No | Yes | 4 | 150 | 73.82 | 0.01 | Welded | SS | 6 | P | No | Internal | No | Yes | 4 | 150 | 71.54 | 0.01 | Welded | SS | 6 | S | No | Internal | No | Yes | 4 | 150 | 71.54 | 0.01 | Welded | SS | 7 | P | No | Internal | No | Yes | 2 | 150 | 20.65 | 0.03 | Welded | SS | 7 | S | No | Internal | No | Yes | 2 | 150 | 20.65 | 0.03 | Welded | SS |
|
8.27.1 |
Is a Thermal Oil Heating system fitted? If yes, identify tanks? |
N/A, |
8.28 |
Maximum temperature cargo can be loaded / maintained: |
66.0 °C / 150.8 °F |
66 °C / 150.8 °F |
8.28.1 |
Minimum temperature cargo can be loaded / maintained: |
|
|
8.29 |
Is an Inert Gas System (IGS) fitted / operational? |
Yes / Yes |
8.29.1 |
Is a Crude Oil Washing (COW) installation fitted / operational? |
N/A / N/A |
8.30 |
Is IGS supplied by flue gas, inert gas (IG) generator and/or nitrogen: |
IG Generator |
8.30.1 |
If nitrogen generator, specify the applicable flow rate for each of the designed purity modes: |
|
8.31 |
How many cargo pumps can be run simultaneously at full capacity: |
8 |
8.32 |
Cargo Pump Data |
Pump Identity | Pump Location | Type | Type of prime mover | Capacity | At what head? |
---|
12 COPs | Cargo Tank | Centrifugal | Hydraulic | 600 | 125 | 2 COPs for Slop Tanks | Cargo Tank | Centrifugal | Hydraulic | 300 | 125 |
|
8.33 |
Is at least one emergency portable cargo pump provided? |
Yes |
8.34 |
Is tank cleaning equipment fixed in cargo tanks? |
Yes |
8.35 |
Is portable tank cleaning equipment provided? |
Yes |
8.36 |
Tank washing pump capacity: |
200 m3/hr |
8.37 |
Is a washing water heater fitted? If yes is it operational and state max washing water temperature: |
Yes, Yes 80 °C |
8.38 |
What is the maximum number of machines that can be operated at their designed max pressure? |
2 |
8.39 |
Is vessel fitted with a remote cargo tank temperature monitoring system. If yes, is it operational? |
Yes, Yes |
8.40 |
Is vessel fitted with a remote cargo tank pressure monitoring system. If yes, is it operational? |
Yes, Yes |
8.41 |
Is vessel fitted with a cargo tank drier. If yes is it operational and state capacity: |
No, N/A m3/hr |
8.42 |
Is vessel fitted with a cargo cooling system. If yes is it operational and state tanks applicable: |
N/A, N/A
|
8.43 |
Is steam available on deck? |
Yes |
|
9.1 |
Provide details for Mooring Ropes, Wires, Tails and Shackles |
Type | Location and Identity | Material | Diameter/size | Length | LDBF(100-105 % of SDMBL (Tonnes)) | TDBF(125-130 % of SDMBL (Tonnes) | SWL (tonnes) | WLL (tonnes) (50-55% of Max LDBF) | Certificate No. | Installed Date | Reversed Date | Renewal2 Date | Status of line/tail | Condition of line/tail |
---|
Ropes | Fcsle Port outer | Nika Steel High Tenacity Polyester 24strands | 60 | 220 | 67 | 0 | 67 | 33 | 19240729 | Jul 17, 2024 | | Jun 30, 2029 | In Use | Suitable | Ropes | Fcsle Port inner | Nika Steel High Tenacity Polyester 24strands | 60 | 220 | 67 | 0 | 67 | 33 | 19240794 | Jul 17, 2024 | | Jun 30, 2029 | In Use | Suitable | Ropes | Fcsle Stbd outer | Nika Steel High Tenacity Polyester 24strands | 60 | 220 | 67 | 0 | 67 | 33 | 19240791 | Jul 17, 2024 | | Jun 30, 2029 | In Use | Suitable | Ropes | Fcsle Stbd inner | Nika Steel High Tenacity Polyester 24strands | 60 | 220 | 67 | 0 | 67 | 33 | 19240790 | Jul 17, 2024 | | Jun 30, 2029 | In Use | Suitable | Ropes | Fwd main deck - Fwd | Nika Steel High Tenacity Polyester 24strands | 60 | 220 | 67 | 0 | 67 | 33 | 19240446 | Jul 17, 2024 | | Jun 30, 2029 | In Use | Suitable | Ropes | Fwd main deck mid | Nika Steel High Tenacity Polyester 24strands | 60 | 220 | 67 | 0 | 67 | 33 | 19240440 | Jul 17, 2024 | | Jun 30, 2029 | In Use | Suitable | Ropes | Fwd main deck aft | Nika Steel High Tenacity Polyester 24strands | 60 | 220 | 67 | 0 | 67 | 33 | 19240437 | Jul 17, 2024 | | Jul 30, 2029 | In Use | Suitable | Ropes | Main deck aft , fwd | Nika Steel High Tenacity Polyester 24strands | 60 | 220 | 67 | 0 | 67 | 33 | 19240432 | Jul 14, 2024 | | Jun 30, 2029 | In Use | Suitable | Ropes | Main deck aft, mid | Nika Steel High Tenacity Polyester 24strands | 60 | 220 | 67 | 0 | 67 | 33 | 19240789 | Jul 17, 2024 | | Jun 30, 2029 | In Use | Suitable | Ropes | Main deck aft , aft | Nika Steel High Tenacity Polyester 24strands | 60 | 220 | 67 | 0 | 67 | 33 | 19240438 | Jul 17, 2024 | | Jun 30, 2029 | In Use | Suitable | Ropes | Poop deck Port , outer | Nika Steel High Tenacity Polyester 24strands | 60 | 220 | 67 | 0 | 67 | 33 | 19240448 | Jul 17, 2024 | | Jun 30, 2029 | In Use | Suitable | Ropes | Poop deck port , inner | Nika Steel High Tenacity Polyester 24strands | 60 | 220 | 67 | 0 | 67 | 33 | 19240788 | Jul 17, 2024 | | Jun 30, 2029 | In Use | Suitable | Ropes | Poop deck stbd , outer | Nika Steel High Tenacity Polyester 24strands | 60 | 220 | 67 | 0 | 67 | 33 | 19240448 | Jul 17, 2024 | | Jun 30, 2029 | In Use | Suitable | Ropes | Poop deck stbd , inner | Nika Steel High Tenacity Polyester 24strands | 60 | 220 | 67 | 0 | 67 | 33 | 19240431 | Jul 17, 2024 | | Jun 30, 2029 | In Use | Suitable | Ropes | Poop deck mid , port | Nika Steel High Tenacity Polyester 24strands | 60 | 220 | 67 | 0 | 67 | 33 | 19241817 | Jun 17, 2024 | | Jun 30, 2029 | In Use | Suitable | Ropes | Poop deck mid , stbd | Nika Steel High Tenacity Polyester 24strands | 60 | 220 | 67 | 0 | 67 | 33 | 19240444 | Jul 17, 2024 | | Jun 30, 2029 | In Use | Suitable |
|
9.2 |
Details of winches and brake testing including rendering loads |
Mooring winch Location | Split Drum | Motive Power | Remote Operational controls | Heaving power | Hauling Speed | Type of Brake | Designed Brake Max holding load (ISO) (80% of SDMB | Operational brake holding load (60% of SDMBL) | Date of last brake test | Brake Rendering load | Frequency of testing brakes |
---|
1234567 | Yes | Hydraulic | Yes | 16 | 0.25 | Manual | 53.6 | 40.2 | 2024-04-04T00:00:00 | 40.2 | Annual |
|
9.3 |
Provide Details of Mooring bollards and bitts |
Location | Identity No | Certificate Number | Size (mm) | SWL (tonnes) |
---|
Forecastle | 4 | BO-F06,BO-F07 2 on port and 2 on stbd side | 400 | 64 | Maindeck Forward (Port) | 1 | BO-M05 on fwd main deck below the fcsle | 400 | 46 | Maindeck Forward (Stbd) | 1 | BO-M05 on fwd main deck below the fcsle | 400 | 46 | Maindeck Forward (Port) | 1 | BO-M07 for fwd spring mooring winch | 500 | 92 | Maindeck Forward (Stbd) | 1 | BO-M07 for fwd spring mooring winch | 500 | 92 | Maindeck Forward (Port) | 2 | BO-M06 one fwd and one aft from manifolds | 500 | 92 | Maindeck Forward (Port) | 1 | BO-M07 for aft spring mooring winch | 500 | 92 | Maindeck Forward (Stbd) | 1 | BO-M07 for aft spring mooring winch | 500 | 92 | Maindeck Forward (Stbd) | 2 | BO-M06 one fwd and one aft from manifolds | 500 | 92 | Poop Deck (Port) | 2 | BO-A10 / BO-A12 | 400 | 64 | Poop Deck (Stbd) | 2 | BO-A10 / BO-A12 | 400 | 64 | Poop Deck (Port) | 2 | BO-A11 / BO-A13 | 400 | 46 | Poop Deck (Stbd) | 2 | BO-A11 / BO-A13 | 400 | 46 |
|
9.4 |
Provide details of Mooring Fairleads/Chocks |
Type | Location | Identity No | Certificate | Size (mm) | SWL (tonnes) | Modifications | If yes, are modifications class approved? |
---|
Closed chock | Forecastle | 1 | BW-F01 | 600 | 204 | No | No | Closed chock | Forecastle | 6 | CC-F03,CC-F04,CC-F05 (3on port and 3 on stbd side) | 400 | 67 | No | No | Panama type | Forecastle | 2 | PC-F02 (one on each side) | 360 | 64 | No | No | Panama type | Maindeck Forward (Port) | 1 | PC-M01 | 310 | 46 | No | No | Panama type | Maindeck Forward (Stbd) | 1 | PC-M01 | 310 | 46 | No | No | Closed chock | Maindeck Forward (Port) | 1 | CC-M02 | 500 | 92 | No | No | Closed chock | Maindeck Forward (Stbd) | 1 | CC-M02 | 500 | 92 | No | No | Closed chock | Maindeck Forward (Port) | 3 | CC-M03 for fwd spring mooring winch | 400 | 67 | No | No | Closed chock | Maindeck Forward (Stbd) | 3 | CC-M03 for fwd spring mooring winch | 500 | 67 | No | No | Closed chock | Maindeck Forward (Port) | 2 | CC-M02 fore and aft from manifolds pipe support | 500 | 92 | No | No | Closed chock | Maindeck Forward (Stbd) | 2 | CC-M02 fore and aft from manifolds pipe support | 500 | 92 | No | No | Closed chock | Maindeck Forward (Port) | 1 | CC-M02 on aft main deck | 500 | 92 | No | No | Closed chock | Maindeck Forward (Stbd) | 1 | CC-M02 on aft main deck | 500 | 92 | No | No | Closed chock | Maindeck Forward (Port) | 3 | CC-M03 for aft spring mooring winch | 400 | 67 | No | No | Closed chock | Maindeck Forward (Stbd) | 3 | CC-M03 for aft spring mooring winch | 400 | 67 | No | No | Roller fairlead protected by bulwark | Poop Deck (Port) | 1 | RF-A09 | 350 | 67 | No | No | Roller fairlead protected by bulwark | Poop Deck (Port) | 1 | RF-A09 (3 roller fairlead) | 350 | 67 | No | No | Roller fairlead protected by bulwark | Poop Deck (Stbd) | 1 | RF-A09 (3 roller fairlead) | 350 | 67 | No | No | Closed chock | Poop Deck (Port) | 4 | CC-A05,CC-A06, CC-A07,CC-A08 | 400 | 67 | No | No | Closed chock | Poop Deck (Stbd) | 4 | CC-A05,CC-A06, CC-A07,CC-A08 | 400 | 67 | No | No | Panama type | Poop Deck (Port) | 1 | PC-A03 | 360 | 64 | No | No | Panama type | Poop Deck (Stbd) | 1 | PC-A03 | 360 | 64 | No | No | Panama type | Poop Deck (Port) | 1 | PC-A02 | 310 | 46 | No | No | Panama type | Poop Deck (Stbd) | 1 | PC-A02 | 310 | 46 | No | No | Panama type | Poop Deck (Port) | 1 | PC-A01 | 360 | 64 | No | No | Panama type | Poop Deck (Port) | 1 | PC-A04 | 310 | 46 | No | No | Panama type | Poop Deck (Stbd) | 1 | PC-A04 | 310 | 46 | No | No |
|
9.5 |
Number of shackles on port / starboard cable: |
12 / 11 |
9.6 |
Type / SWL of Emergency Towing system forward: |
Chain stopper and Chafing chain |
204 MT |
9.7 |
Type / SWL of Emergency Towing system aft: |
Fixed Escort DK ENT |
204 MT |
9.8 |
What is size of closed chock and/or fairleads of enclosed type on stern: |
600X450 |
9.9 |
What is SWL of closed chock and/or fairleads of enclosed type on stern: |
204 MT |
9.10 |
What is SWL of bollard on poop deck suitable for escort tug: |
92 MT |
9.11 |
Derrick / Crane description (Number, SWL and location): |
Cranes: 1 x 10 Tonnes MIDSHIPS CENTER |
9.12 |
Accommodation ladder direction: |
Aft |
9.13 |
Does vessel have a portable gangway? If yes, state length: |
Yes |
13 m |
9.14 |
Does the vessel meet the recommendations in the latest edition of OCIMF 'Recommendations for Equipment Employed in the Bow Mooring of Conventional Tankers at Single Point Moorings (SPM)'? |
Yes |
9.15 |
If fitted, how many chain stoppers: |
1 |
9.16 |
Details of Bow chain stoppers:
Location/Number of Bow Chain Stopper | Type | Operation | SWL | Min Size of Chain | Max size of Chain |
---|
Stbd | Tongue | Manual | 204 | 76 | 76 |
|
9.17 |
Distance between the bow fairlead and chain stopper/bracket: |
3.50 m |
9.18 |
Is bow chock and/or fairlead of enclosed type of OCIMF recommended size (600mm x 450mm)? If not, give details of size: |
Yes
|
|
10.1 |
Speed |
Maximum |
Economical |
Ballast speed: |
15 Kts (WSNP) |
13 Kts (WSNP) |
Laden speed: |
14 Kts (WSNP) |
13 Kts (WSNP) |
10.2 |
What type of fuel is used for main propulsion? If other, then specify: |
HFO, LSMGO (in ECAs) |
|
What type of fuel is used for generating plant |
VLSFO & LSMGO |
10.3 |
Bunker Tank Capacities:
Tank Name | Bunker Type | Tank Type | Capacity | Max Pressure |
---|
HFO P | HFO | Main Bunker Tank | 413 | 5 | HFO S | HFO | Main Bunker Tank | 518.17 | 5 | HFO P | HFO | Service Tank | 24.24 | 5 | HFO P | HFO | Settling Tank | 24.24 | 5 | LSHFO C | Other (specify) | Main Bunker Tank | 322.54 | 5 | LSHFO P | Other (specify) | Service Tank | 23.87 | 5 | LSHFO P | Other (specify) | Settling Tank | 24.24 | 5 | MDO P | MDO | Main Bunker Tank | 107.59 | 5 | MDO P | MDO | Service Tank | 20.89 | 5 | MDO P | MDO | Settling Tank | 20.89 | 5 | MGO S | Other (specify) | Main Bunker Tank | 120.5 | 5 | MGO S | Other (specify) | Service Tank | 20.89 | 5 | MGO P | Other (specify) | Service Tank | 10.33 | 5 |
If other, then specify |
10.4 |
Is vessel fitted with fixed or controllable pitch propeller(s): |
Fixed |
10.5 |
Engines |
No |
Capacity |
Make/Type |
Main engine: |
1 |
7,570 Kw |
Hyndai MAN b&W |
Aux engine: |
3 |
1,005 Kw |
Hundai HHI 6L21/33 |
Power packs: |
5 |
m3/hr |
STX (3 Hydraulic and 2 Engine) |
Boilers: |
1 |
18 MT/Hr |
Aalborg OM 18000 |
10.6 |
What is brake horse power of bow thruster (if fitted): |
N/A, bhp |
10.7 |
What is brake horse power of stern thruster (if fitted): |
N/A, bhp |
10.8 |
Does the vessel have an EEDI Rating number? If yes then provide EEDI rating: |
Yes, 4.29 |
|
If No then provide reason: |
|
|
Is the EEDI rating verified by Class, 3rd Party or Owner? |
Class |
10.9 |
Does the vessel have an EEXI Rating number? If yes then provide EEXI rating: |
Yes, 4.29 |
|
If No then provide reason: |
|
|
Is the EEXI rating verified by Class, 3rd Party or Owner? |
Class |
10.10 |
Does the vessel have a CII Rating number? If yes then provide CII rating: |
Yes, C |
|
If No then provide reason: |
|
|
Is the CII rating verified by Class, 3rd Party or Owner? |
|
10.11 |
Does the vessel have an EIV Rating number? If yes then provide EIV rating: |
, |
|
If No then provide reason: |
|
|
Is the EIV rating verified by Class, 3rd Party or Owner? |
|
10.12 |
What is the ships NOx control level (Tier I, Tier II, and Tier III)?: |
Tier II |
|
List of equipment fitted for NOx Tier III achievement for all engines (LP Selective catalytic reduction, HP Selective catalytic reduction, Exhaust gas recirculation, Alternative fuel etc...) |
|
10.13 |
Does the vessel use an Exhaust Gas Cleaning System? |
No |
10.14 |
What is the type of scrubber fitted as part of the EGCS onboard? |
|
|
11.1 |
Does vessel comply with recommendations contained in OCIMF/ICS Ship To Ship Transfer Guide (Petroleum, Chemicals or Liquified Gas, as applicable)? |
Yes |
11.2 |
What is maximum outreach of cranes / derricks outboard of the ship's side: |
9.10 m |
11.3 |
Date/place of last STS operation: |
Off Lagos, Nigeria on 18/10/22 |
11.4 |
Does the vessel have a ship specific STS plan: |
|
|
12.1 |
Last three cargoes / charterers / voyages (Last / 2nd Last / 3rd Last): |
|
12.2 |
Has ship been involved in a pollution, grounding, collision or allision incident during the past 12 months? If yes, provide details: No
|
12.3 |
Date and place of last Port State Control inspection: |
Oct 12, 2024, San Juan |
12.4 |
Any outstanding deficiencies as reported by any Port State Control? If yes, provide details: |
N/A N/A |
12.5 |
Recent Oil company inspections/screenings (To the best of owners knowledge and without guarantee of acceptance for future business)*:
*"Approvals" are not given by Oil Majors and ships are accepted for the voyage on a case by case basis. |
Contact owner for details. |
12.6 |
Date / place of last SIRE inspection: |
Aug 14, 2024 / New Haven, USA |
12.6.1 |
Date / place of last CDI inspection: |
May 12, 2020 / PARANAGUA BRAZIL |
12.7 |
Additional information relating to features of the ship or operational characteristics: |
Additional Cargo reducers 8" x 6" (3pcs) |